精品在线播放不卡_国产黄色在线视频_玖玖在线中文字慕_国产福利自产拍视频_国产福利自产拍视频_亚洲最大啪啪网址_caopeng欧美_欧美日韩岛国在线观看

To provide customers with systematic
and intelligent water treatment solutions
Current location: Home Page > News > Industry Trends
What necessary investigations should be made before
Time:2021-07-08 10:01:49
Article release:Admin
Original author:Unknown
Source:Internet

What necessary investigations should be made before screening corrosion and scale inhibitors


As we all know, corrosion inhibitor is a kind of substance added to water that can interfere with the electrochemical action of corrosion and can prevent or reduce the corrosion rate of metal. Before using experimental verification, we should master the actual situation on the site and conduct a comprehensive investigation on the circulating cooling water system to be processed. This is also an important basis for Ande technology to choose recycled water agents. The specific methods are summarized as follows:




(1) Water quality




(1) Understand the source water is surface water or groundwater, whether it is polluted. Groundwater shall be analyzed quarterly for not less than one year. If there are several Wells, the water quality of each well should be known. For surface water, complete monthly analysis data of not less than one year should be collected.




(2) Supplement water quality to understand whether the raw water, after pretreatment and pretreatment methods, the use of flocculant or coagulant varieties. Full monthly water quality analysis data of not less than one year shall be collected. '




(3) water quality of circulating cooling




If the circulation system has been in operation, the on-site circulating water quality data can be directly used as the basis for selecting the formula. However, data should be selected when the concentration multiple is stable, at least monthly data for a year. The data at natural pH values should be known as far as possible. '-




(2) Design data of circulating cooling water system




Need to understand the type of cooling tower, circulating water FFI (m3/h), the system 'volume V (m3), the design of inlet and outlet tower water temperature (°C). It is also necessary to know the concentration multiple possible for the system and the effluent B(m3/h), wind-blown loss D(MVh) and replenishment M(m3/h) at the operating multiple. And understand the annual temperature, humidity and water temperature trends. ,




The average residence time of the agent in the system, T[V7(B+D)], should not exceed 50h in order to prevent the agent from decomposing or precipitating from hydrolysis.




(3) Data and process characteristics of the water cooler




Need to understand all the data of water treatment cooler, including the number, model, structure, material, thermal strength, process medium inlet and outlet water temperature, water flow rate and other issues.




(4) Understand the surrounding discharge environment and air pollution, understand the environment of the area through which sewage flows after discharge, whether there are agricultural crops, aquatic crops and the final discharge water area, etc., all of which will affect the stability of the circulating water system.



Label:
亚洲色欧美性另类春色| 超碰在线免费公开| 国产在线123区| 国产免费二区亚洲欧美视频四| www.绿色av| 揄拍免费在线| 日韩AV不卡在线| 狼友视频永久入口| 高清无码在线不卡| 欧美激情网址网站| 午夜福利网站男男| 亚洲成人丁香五月| 国产亚洲AV无码| 一区二区乱伦操B网站91| 丁香五月欧美在线| 国产91在线 欧美| 国产熟女高潮视频| 日韩精品在线观看性色| 久久经典丝袜视频| 国产色爱一区二区| 丁香婷婷卡通动漫| 美女网站色色高潮| 日本女同中文字幕| 日韩无码视频2区| 亚洲第一一区二区国产日韩AV无码| 婷婷五月手机在线| 香蕉成人精品导航| 欧美色婷婷五月天| 99r在线免费观看| 成人网站国产女同| 国产99偷窥自拍视频| av片网站婷婷五月天| 国产性感女主播二区| yw国产AV剧情| 伊人久久精品蜜桃| 最新在线网站av| 在线免费观看亚洲无码| 国产三区视频在线观看| 色色污污久久一区| 亚洲无码中字公司| 亚洲伊人影院欧美精品免费看|